Housing
Silvertrees
Bothwell
On a steeply sloping site the construction solution was a steel podium deck from basement to ground floor followed by traditional construction to 3rd floor , topped out with two storeys of timber kit.
Client
Patersons of Greenockhill
Architect
DTA
QS
EC Harris
Engineer
Fairhurst
Duration
15 months