Bray Controls (UK) Ltd

Inchinnan, Renfrewshire

To Facilitate Bray Control's expansion in Scotland Muir Construction were appointed using a Pre-Construction Services Agreement to bring the full consultant design team to the table along side their construction expertise. This collaborative approach captured the Bray Control's brief and steered the design through planning and warrant applications to Stage 4 Design at which point contract sums were agreed and the construction of the extension and internal alterations was given the green light.

Client

Bray Controls (UK) Ltd

Architect

Entasis

QS

CBRE T&T

Engineer

Boyle Consultants

Services Engineer

Rybka

Duration

34 Weeks