Pacific Quay

Glasgow

Positioned on partly reclaimed land and old dock walls, the foundation strategy and construction for this site required exceptional accuracy. Piles had to be driven between dock wall tie rods to transfer the building loads on to the shale river bed, without disturbing the integrity of the dock walls.

Client

McKenzie Partnership

Architect

Cooper Cromar

QS

Davis Langdon

Engineer

Struer

Duration

11 months