Pacific Quay
Glasgow
Positioned on partly reclaimed land and old dock walls, the foundation strategy and construction for this site required exceptional accuracy. Piles had to be driven between dock wall tie rods to transfer the building loads on to the shale river bed, without disturbing the integrity of the dock walls.
Client
McKenzie Partnership
Architect
Cooper Cromar
QS
Davis Langdon
Engineer
Struer
Duration
11 months